Construction Ecology: (Record no. 1055)

MARC details
000 -LEADER
fixed length control field 02356nmm a22002537a 4500
003 - CONTROL NUMBER IDENTIFIER
control field ES-BaAUN
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20221223133312.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 221102b ||| |o||j| 00| 0 eng d
022 ## - INTERNATIONAL STANDARD SERIAL NUMBER
International Standard Serial Number 2575-5374
040 ## - CATALOGING SOURCE
Original cataloging agency ES-BaAUN
Language of cataloging eng
Transcribing agency ES-BaAUN
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Moe, Kiel
Relator term author.
245 11 - TITLE STATEMENT
Title Construction Ecology:
Remainder of title The Seagram Building (1956–)
260 3# - PUBLICATION, DISTRIBUTION, ETC.
Name of publisher, distributor, etc. UrbanNext,
Date of publication, distribution, etc. December 6, 2021.
300 ## - PHYSICAL DESCRIPTION
Extent 2008 words.
500 ## - GENERAL NOTE
General note Densities, Energy and sustainability, Essay, expanding design practices, Formats, High Density, Kiel Moe, Topics, Unless
501 ## - WITH NOTE
With note Building, Building Technology, Carbon-emissions, Concrete, Economy, Energy flow, Essay, History, Iconic architecture, Metabolism, New York, Performative Envelope, Political & Economic Approach, Power of materiality, Real Estate, Research, Steel, Stereotomy, Urban Development, Urban ecology, Urban environment, USA
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note This essay is an excerpt of "Unless" by Kiel Moe, published by Actar Publishers -- https://lccn.loc.gov/2019951100
520 ## - SUMMARY, ETC.
Summary, etc. Construction on the Seagram Building commenced with the completion of the Montana’s demolition in January 1956. The spring of that year was occupied by excavation operations that would soon accommodate the building’s massive steel and concrete footings, a significant portion of the building’s subterranean mechanical plant, and parking for one hundred vehicles. By June, the concrete retaining walls were filled by steel framing and formed the base of the tower and its future plaza, used during construction as a construction yard. By the end of summer 1956, the steel framing rose several stories above grade and was soon followed by board-formed concrete that encased the steel structure. By the fall, steel brackets methodically mounted to steel and concrete perimeter frame of the Seagram Building began to accept the longest of the famous I-beam extrusions that are the structure of its envelope. Contrary to many accounts of the Seagram Building, these I-beams are not steel, nor even bronze. What is referred to as the “bronze” envelope of the Seagram Building is actually a brass alloy oiled and oxidized to look like bronze.
653 00 - INDEX TERM--UNCONTROLLED
Uncontrolled term Architecture
653 00 - INDEX TERM--UNCONTROLLED
Uncontrolled term Construction
653 00 - INDEX TERM--UNCONTROLLED
Uncontrolled term Seagram Building
856 40 - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier <a href="https://urbannext.net/construction-ecology/">https://urbannext.net/construction-ecology/</a>
Public note Access to info
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Computer Files
Suppress in OPAC No
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Date acquired Total Checkouts Date last seen Price effective from Koha item type
    Dewey Decimal Classification     urbanNext-Actar urbanNext-Actar 12/23/2022   12/23/2022 12/23/2022 Computer Files

Powered by Koha