Tampa as the Ecological City. Living with and Inhabiting the Estuary and the Swamp (Record no. 1506)

MARC details
000 -LEADER
fixed length control field 02027nmm a22002657a 4500
003 - CONTROL NUMBER IDENTIFIER
control field ES-BaAUN
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20230112085131.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 221102| ||||go||d|||||| |||| 00| 0 eng d
022 ## - INTERNATIONAL STANDARD SERIAL NUMBER
International Standard Serial Number 2575-5374
040 ## - CATALOGING SOURCE
Original cataloging agency ES-BaAUN
Language of cataloging eng
Transcribing agency ES-BaAUN
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Bassett, Shannon
Relator term author.
245 10 - TITLE STATEMENT
Title Tampa as the Ecological City. Living with and Inhabiting the Estuary and the Swamp
260 3# - PUBLICATION, DISTRIBUTION, ETC.
Name of publisher, distributor, etc. urbanNext,
Date of publication, distribution, etc. November 2, 2017.
300 ## - PHYSICAL DESCRIPTION
Extent 4688 words.
500 ## - GENERAL NOTE
General note [RE]STITCH TAMPA, Actar, Energy and sustainability, Essay, High Density, Middle Density, Politics and economics, Shannon Bassett, Territory and mobility, Urban Paradigms
501 ## - WITH NOTE
With note Ecological activation, Ecological researches, Ecological urbanism, Essay, Estuary, Florida, Housing market, Land-banking, Local resources, New Statements on Nature, Post-war society, Renaturalizing city, Renewable resources, Resilience, Resilient cities, Tampa, Urban Paradigms, Urban policies, Water infrastructure, Waterfront
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Excerpt from "(Re)Stitch Tampa. Riverfront-Designing the Post-War Coastal American City with Ecologies", 2017 -- https://lccn.loc.gov/2016946867
520 ## - SUMMARY, ETC.
Summary, etc. The (Re) Stitch Tampa project was initially conceptualized during 2010 around the advent of the announcement of what was to be the first high-speed rail line in the US. The Obama Administration had just announced as part of its “New” New Deal program, that the region was to receive 1.2 billion dollars in federal monies earmarked for the construction of a high-speed rail line along the Tampa-Orlando corridor. The program was reminiscent of Franklin D. Roosevelt’s WPA program, during the great Depression, where the federal government funded large-scale public infrastructural projects with the intent of jump-starting the economy.
653 00 - INDEX TERM--UNCONTROLLED
Uncontrolled term Infrastructure
653 00 - INDEX TERM--UNCONTROLLED
Uncontrolled term Mobility
653 05 - INDEX TERM--UNCONTROLLED
Uncontrolled term Florida, USA
653 05 - INDEX TERM--UNCONTROLLED
Uncontrolled term USA
856 40 - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier <a href="https://urbannext.net/tampa-ecological-city-living-inhabiting-estuary-swamp/">https://urbannext.net/tampa-ecological-city-living-inhabiting-estuary-swamp/</a>
Public note Access to info
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Computer Files
Suppress in OPAC No
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Date acquired Total Checkouts Date last seen Price effective from Koha item type
    Dewey Decimal Classification     urbanNext-Actar urbanNext-Actar 01/12/2023   01/12/2023 01/12/2023 Computer Files

Powered by Koha