Ballast Point: From Fossil Fuel Storage to Renewable Energy Provider (Record no. 1642)

MARC details
000 -LEADER
fixed length control field 02139nmm a22002657a 4500
003 - CONTROL NUMBER IDENTIFIER
control field ES-BaAUN
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20230118104625.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 221102| ||||go||d|||||| |||| 00| 0 eng d
022 ## - INTERNATIONAL STANDARD SERIAL NUMBER
International Standard Serial Number 2575-5374
040 ## - CATALOGING SOURCE
Original cataloging agency ES-BaAUN
Language of cataloging eng
Transcribing agency ES-BaAUN
110 2# - MAIN ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element McGregor Coxall
Relator term architects
245 10 - TITLE STATEMENT
Title Ballast Point: From Fossil Fuel Storage to Renewable Energy Provider
260 3# - PUBLICATION, DISTRIBUTION, ETC.
Name of publisher, distributor, etc. urbanNext,
Date of publication, distribution, etc. February 17, 2018.
300 ## - PHYSICAL DESCRIPTION
Extent 591 words.
500 ## - GENERAL NOTE
General note Energy and sustainability, FULL, McGregor Coxall, Middle Density, Project, Territory and mobility, Urban Paradigms
501 ## - WITH NOTE
With note Adaptive reuse, Australia, Built landscape, Ecological agencies, Ecological researches, Energetic Approach, Fuel, Future Urban Legacy Lab, Green, Harborfront, Overlapping layers, Park, Playground, Project, Recycling, Regenerated industrial facility, Sustainability, Sydney, Territorial Approach, Urban Legacy, Water, Waterfront, Wind energy
520 ## - SUMMARY, ETC.
Summary, etc. This multi award winning 2.5ha post industrial waterfront park is located on a contaminated former lubricant production site on the Birchgrove Peninsula in the inner reaches of Sydney harbour. The site’s richly layered history included occupation by indigenous people, construction of the ’Menevia’ marine villa in the 1860’s, quarry use for ship ballast and finally petroleum distillation by Caltex from the 1920’s until 2002. As lead consultant, McGregor Coxall undertook project management, design development, construction documentation and administered the construction contract for the client. This project’s design is driven by a strong environmental agenda where recycled materials are used site wide. Wind turbine generators reflect a movement away from fossil fuels and an integrated stormwater management and recycle system ensures that all stormwater entering Sydney Harbour from the site has been cleaned and polished prior to its discharge.
653 00 - INDEX TERM--UNCONTROLLED
Uncontrolled term Architecture
653 00 - INDEX TERM--UNCONTROLLED
Uncontrolled term Sustainability
653 00 - INDEX TERM--UNCONTROLLED
Uncontrolled term Renovation
653 05 - INDEX TERM--UNCONTROLLED
Uncontrolled term Sydney, Australia
653 05 - INDEX TERM--UNCONTROLLED
Uncontrolled term Australia
856 40 - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier <a href="https://urbannext.net/ballast-point/">https://urbannext.net/ballast-point/</a>
Public note Access to info
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Computer Files
Suppress in OPAC No
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Date acquired Total Checkouts Date last seen Price effective from Koha item type
    Dewey Decimal Classification     urbanNext-Actar urbanNext-Actar 01/18/2023   01/18/2023 01/18/2023 Computer Files

Powered by Koha