Streetlight Tagpuro: Post Disaster Reconstruction (Record no. 1862)

MARC details
000 -LEADER
fixed length control field 01785nmm a22002537a 4500
003 - CONTROL NUMBER IDENTIFIER
control field ES-BaAUN
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20230203103734.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 221102| ||||go||d|||||| |||| 00| 0 eng d
022 ## - INTERNATIONAL STANDARD SERIAL NUMBER
International Standard Serial Number 2575-5374
040 ## - CATALOGING SOURCE
Original cataloging agency ES-BaAUN
Language of cataloging eng
Transcribing agency ES-BaAUN
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Furunes, Oscar Eriksson
Relator term architect.
245 10 - TITLE STATEMENT
Title Streetlight Tagpuro: Post Disaster Reconstruction
260 3# - PUBLICATION, DISTRIBUTION, ETC.
Name of publisher, distributor, etc. urbanNext,
Date of publication, distribution, etc. July 26, 2018.
300 ## - PHYSICAL DESCRIPTION
Extent 449 words.
500 ## - GENERAL NOTE
General note Eriksson Furunes, Low Density, Project, Territory and mobility, Urban Paradigms
501 ## - WITH NOTE
With note Architecture, Collaborative work, Community, Community Facilities, Cooperation, Craftmanship, Design process, Emergency architecture, Empowering society, Local materials, Local techniques, Mapping, Participation, Philippines, Project, Reconstruction, Territorial Approach, Timber, Timber frame, Urban Paradigms
520 ## - SUMMARY, ETC.
Summary, etc. With the increase of natural and man-made disasters around the globe, it becomes increasingly important to understand how architects, and architecture, can contribute to post disaster reconstruction efforts. While there is an argument that architects are the last people needed in this scenario, a collaborative process of planning, designing and building can enable those affected by the disaster to have a say in the processes that eventually affect them. Streetlight Tagpuro is a collaborative design and build process that began 3 years before the strongest typhoon to ever hit land devastated Tacloban city in the Philippines, and the 3 years of reconstruction that followed.
653 00 - INDEX TERM--UNCONTROLLED
Uncontrolled term Emergency Architecture
653 00 - INDEX TERM--UNCONTROLLED
Uncontrolled term Natural Disasters
653 05 - INDEX TERM--UNCONTROLLED
Uncontrolled term Tagpuro, Tacloban City, Philippines
653 05 - INDEX TERM--UNCONTROLLED
Uncontrolled term Philippines
856 40 - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier <a href="https://urbannext.net/streetlight-tagpuro/">https://urbannext.net/streetlight-tagpuro/</a>
Public note Access to info
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Computer Files
Suppress in OPAC No
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Date acquired Total Checkouts Date last seen Price effective from Koha item type
    Dewey Decimal Classification     urbanNext-Actar urbanNext-Actar 02/03/2023   02/03/2023 02/03/2023 Computer Files

Powered by Koha