<?xml version="1.0" encoding="UTF-8"?>
<record
    xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"
    xsi:schemaLocation="http://www.loc.gov/MARC21/slim http://www.loc.gov/standards/marcxml/schema/MARC21slim.xsd"
    xmlns="http://www.loc.gov/MARC21/slim">

  <leader>01424nmm a22002897a 4500</leader>
  <controlfield tag="003">ES-BaAUN</controlfield>
  <controlfield tag="005">20230228090429.0</controlfield>
  <controlfield tag="008">221102| ||||go||d|||||| |||| 00| 0 eng d</controlfield>
  <datafield tag="022" ind1=" " ind2=" ">
    <subfield code="a">2575-5374</subfield>
  </datafield>
  <datafield tag="040" ind1=" " ind2=" ">
    <subfield code="a">ES-BaAUN</subfield>
    <subfield code="b">eng</subfield>
    <subfield code="c">ES-BaAUN</subfield>
  </datafield>
  <datafield tag="110" ind1="2" ind2=" ">
    <subfield code="a">Walters &amp; Cohen</subfield>
    <subfield code="e">architects.</subfield>
  </datafield>
  <datafield tag="245" ind1=" " ind2=" ">
    <subfield code="a">Reigate Grammar School: Masterplan and Space Audit</subfield>
  </datafield>
  <datafield tag="260" ind1="3" ind2=" ">
    <subfield code="b">urbanNext,</subfield>
    <subfield code="c">February 25, 2019.</subfield>
  </datafield>
  <datafield tag="300" ind1=" " ind2=" ">
    <subfield code="b">304 words.</subfield>
  </datafield>
  <datafield tag="500" ind1=" " ind2=" ">
    <subfield code="a">Middle Density, Project, Territory and mobility, Urban Paradigms, Walters &amp; Cohen	</subfield>
  </datafield>
  <datafield tag="501" ind1=" " ind2=" ">
    <subfield code="a">Brick, Designing Climate, Educational Building, Educational Program, Flexibility, Library, Masterplan, Project, Refitting Places, School, Territorial Approach, Timber, UK, Ventilation, Working Space	
</subfield>
  </datafield>
  <datafield tag="504" ind1=" " ind2=" ">
    <subfield code="a">Photography: Dennis Gilbert/VIEW
</subfield>
  </datafield>
  <datafield tag="520" ind1=" " ind2=" ">
    <subfield code="a">Following their competition win in 2013, Walters &amp; Cohen first undertook a masterplan and space audit of the school&#x2019;s existing facilities, which were spread across two sites. At that time, the small parcel of land between them became available and was the ideal site for the new 1,620m2 library and sixth form centre, funded by the Peter Harrison Foundation.</subfield>
  </datafield>
  <datafield tag="653" ind1=" " ind2=" ">
    <subfield code="a">Architecture</subfield>
  </datafield>
  <datafield tag="653" ind1=" " ind2=" ">
    <subfield code="a">Project</subfield>
  </datafield>
  <datafield tag="653" ind1=" " ind2=" ">
    <subfield code="a">School</subfield>
  </datafield>
  <datafield tag="653" ind1="5" ind2=" ">
    <subfield code="a">Reigate, United Kingdom</subfield>
  </datafield>
  <datafield tag="653" ind1="5" ind2=" ">
    <subfield code="a">United Kingdom</subfield>
  </datafield>
  <datafield tag="653" ind1="5" ind2=" ">
    <subfield code="a">UK</subfield>
  </datafield>
  <datafield tag="856" ind1="4" ind2="0">
    <subfield code="u">https://urbannext.net/reigate-grammar-school/</subfield>
    <subfield code="z">Access to info</subfield>
  </datafield>
  <datafield tag="942" ind1=" " ind2=" ">
    <subfield code="2">ddc</subfield>
    <subfield code="c">CF</subfield>
    <subfield code="n">0</subfield>
  </datafield>
  <datafield tag="999" ind1=" " ind2=" ">
    <subfield code="c">2110</subfield>
    <subfield code="d">2110</subfield>
  </datafield>
  <datafield tag="952" ind1=" " ind2=" ">
    <subfield code="0">0</subfield>
    <subfield code="1">0</subfield>
    <subfield code="2">ddc</subfield>
    <subfield code="4">0</subfield>
    <subfield code="7">0</subfield>
    <subfield code="a">9876543210</subfield>
    <subfield code="b">9876543210</subfield>
    <subfield code="d">2023-02-28</subfield>
    <subfield code="l">0</subfield>
    <subfield code="r">2023-02-28</subfield>
    <subfield code="w">2023-02-28</subfield>
    <subfield code="y">CF</subfield>
  </datafield>
</record>
