Barcelona, Bricks, Building construction, Circulation, Courtyard, Density, Efficiency, Energy, Façade, Industrial context, Landmark, LEED, Power of materiality, Project, Spain, Sports Facilities, Urban space, Volume
Photography: JoséHevia and Simón García
Given the large volume required by the functional brief (three sports courts) in relation to the limited dimensions of the site and the high urban density of the area, the architects decided that much of the sports complex would be partly underground. The meticulous design of the building in section ensures good lighting, natural ventilation, ease of access and safe evacuation, even for the lower areas.
2575-5374
Architecture Project Sports Center Barcelona, Spain Spain