| 000 | 01445nmm a22002657a 4500 | ||
|---|---|---|---|
| 003 | ES-BaAUN | ||
| 005 | 20221230103022.0 | ||
| 008 | 221102| ||||go||d|||||| |||| 00| 0 eng d | ||
| 022 | _a2575-5374 | ||
| 040 |
_aES-BaAUN _beng _cES-BaAUN |
||
| 110 | 2 |
_aFAR frohn&rojas _earchitect. |
|
| 245 | 1 | 0 | _aWohnregal: Serial Construction Housing |
| 260 | 3 |
_bUrbanNext, _cMay 20, 2021. |
|
| 300 | _a475 words. | ||
| 500 | _aFAR, Middle Density, Politics and economics, Project, Technology and fabrication, Urban Paradigms | ||
| 501 | _aAffordable Housing, Berlin, Circulation, Climate control, Collective housing, Comfortable environment, Construction, Germany, low cost, New urban lifestyles, Optimized construction, Prefabrication, Project, Semi-prefab concrete slabs, Structure | ||
| 520 | _aThe “Wohnregal” is a six-story building in Berlin housing live/work ateliers. It was built using pre-cast concrete elements common in industrial warehouse construction: pillars, beams and TT-ceilings (ceiling elements including two downstand beams). Underlying the choice for this serial construction technique was the goal of bridging two apparently contradictory challenges facing the housing market in Berlin. | ||
| 653 | 0 | 0 | _aPre-cast Concrete |
| 653 | 0 | 0 | _aSerial Construction |
| 653 | 0 | 0 | _aArchitecture |
| 653 | 0 | 5 | _aBerlin, Germany |
| 653 | 0 | 5 | _aGermnay |
| 856 | 4 | 0 |
_uhttps://urbannext.net/wohnregal/ _zAccess to info |
| 942 |
_2ddc _cCF _n0 |
||
| 999 |
_c1185 _d1185 |
||