000 01586nmm a22002777a 4500
003 ES-BaAUN
005 20230214130113.0
008 221102| ||||go||d|||||| |||| 00| 0 eng d
022 _a2575-5374
040 _aES-BaAUN
_beng
_cES-BaAUN
110 2 _aÁbalos + Sentkiewicz Arquitectos
_earchitects.
245 1 0 _aHigh-Speed Train Station in Logroño: Park and Urban Design
260 3 _burbanNext,
_cOctober 21, 2019.
300 _a519 words.
500 _aAbalos+Sentkiewicz, Middle Density, Project, Territory and mobility, Urban Paradigms
501 _aArchitecture&climate, City, Context, Continuity, Geometry, Green roof, Greenery, Infrastructure, Landscape, Logroño, Mass Transportation, Park, Project, Public Space, Railway infrastructure, Skylight, Spain, Topography, Transportation, Transportation Systems, Urban design, User’s experience
504 _aPhotography: José Hevia
520 _aOverground railway stations constitute a brusque interruption of urban continuity, leaving an empty space in the city that often brings social segregation with it. Undergrounding the tracks with the station at street level, conversely, is an opportunity to develop a new project that restores connectivity to uncommunicated areas, creating a large, central public park on which the station roof makes its geometric, topographic imprint.
653 0 0 _aArchitecture
653 0 0 _aInfrastructure
653 0 0 _aMobility
653 0 5 _aLogroño, Spain
653 0 5 _aSpain
856 4 0 _uhttps://urbannext.net/high-speed-train-station/
_zAccess to info
942 _2ddc
_cCF
_n0
999 _c1947
_d1947