000 01383nmm a22002777a 4500
003 ES-BaAUN
005 20230316085941.0
008 221102| ||||go||d|||||| |||| 00| 0 eng d
022 _a2575-5374
040 _aES-BaAUN
_beng
_cES-BaAUN
110 2 _aMVRDV (Firm)
_earchitects.
245 _aWERK12: Mixed-Use Development
260 3 _burbanNext,
_cNovember 06, 2019.
300 _a485 words.
500 _aMiddle Density, MVRDV, Project, Territory and mobility, Urban Paradigms
501 _aCirculation, Design strategies, Façade, Geometry, Germany, Industrial context, Leisure, Lighting design, Mixed use, Munich, Offices, Open conversation, Project, Public stage, Street Culture, Swimming Pool, Transformation, Urban Development, Urban regeneration, Working Space
504 _aPhotography: Ossip van Duivenbode
520 _aForming the nucleus of the Werksviertel-Mitte district, an urban regeneration plan on a former industrial site, the 7,700m2 mixed-used development located close to Munich’s East Station stands out with its bold and expressive art façade, featuring five-meter-tall verbal expressions found in German comics.
653 _aArchitecture
653 _aMixed-use-building
653 _aProject
653 5 _aMunich, Germany
653 5 _aGermany
856 4 0 _uhttps://urbannext.net/werk12/
_zAccess to info
942 _2ddc
_cCF
_n0
999 _c2407
_d2407