000 01572nmm a22002777a 4500
003 ES-BaAUN
005 20230317120612.0
008 221102| ||||go||d|||||| |||| 00| 0 eng d
022 _a2575-5374
040 _aES-BaAUN
_beng
_cES-BaAUN
110 2 _aBarozzi Veiga (Firm) ‎
_earchitects.
245 _aMusée Cantonal des Beaux-Arts: Continuity of the City’s Public Space
260 3 _burbanNext,
_cDecember 05, 2019.
300 _a919 words.
500 _aBarozzi/Veiga, Middle Density, Project, Territory and mobility, Urban Paradigms
501 _aArchitecture, Circulation, Cultural Facility, Design strategies, Industrial context, Integration, Lausanne, Light, Masterplan, Material atmospheres, Museum, Project, Public Catalyst, Public Space, Refitting Places, Switzerland, Transformation, Urban Legacy, Urban strategy
504 _aPhotography: Simon Menges
520 _aIn 2011 Barozzi/Veiga won the international competition for the masterplan of the new Art district in Lausanne, Switzerland – Platform 10 – and the design of the Fine Arts Museum. Located in the city center, the project proposed a master plan for the city’s three main museums: the Museum of Fine Arts (MCBA), the Museum of Contemporary Design and Applied Arts (MUDAC) and the Photography Museum Musée de l’Elysée.
653 _aArchitecture
653 _aProject
653 _aMuseum-design
653 5 _aLausanne, Switzerland
653 5 _aSwitzerland
856 4 0 _uhttps://urbannext.net/musee-cantonal-des-beaux-arts/
_zAccess to info
942 _2ddc
_cCF
_n0
999 _c2445
_d2445