000 01427nmm a22002777a 4500
003 ES-BaAUN
005 20230323121311.0
008 221102| ||||go||d|||||| |||| 00| 0 eng d
022 _a2575-5374
040 _aES-BaAUN
_beng
_cES-BaAUN
110 2 _aHelen & Hard (Firm) ‎
_earchitects.
245 _aGrimstad Library: A Social Meeting Point
260 3 _burbanNext,
_cJanuary 30, 2020.
300 _a274 words.
500 _aDesigning Matter, Energy and sustainability, Helen & Hard Architects, Middle Density, Project, Territory and mobility, Urban Paradigms
501 _aAccessibility, Architecture, Cultural Facility, Extension, Grimstad, Library, Norway, Prefabrication, Project, Public Catalyst, Timber, Timber frame, Timber Structure, Transformation, Waterfront
504 _aPhotography: Sindre Ellingsen
520 _aThe new library in Grimstad has a central, waterfront location. It lies between the old town and the new town center. The intention is for the library to not only be a place to read and borrow books, but for the building to become a social meeting point with the opportunity to host a variety of cultural events. The building is accessible for all.
653 _aArchitecture
653 _aProject
653 _aLibrary-design
653 5 _aGrimstad, Norway
653 5 _aNorway
856 4 0 _uhttps://urbannext.net/grimstad-library/
_zAccess to info
942 _2ddc
_cCF
_n0
999 _c2495
_d2495