000 01238nmm a22002777a 4500
003 ES-BaAUN
005 20230926092252.0
008 221102| ||||go||d|||||| |||| 00| 0 eng d
022 _a2575-5374
040 _aES-BaAUN
_beng
_cES-BaAUN
110 2 _aTEF Design
_earchitects.
245 _aLarkin Street Substation Expansion
260 3 _burbanNext,
_cJuly 25, 2022.
300 _b340 words.
500 _aContributors, Densities, Formats, Middle Density, Project, Technology and fabrication, TEF Desgin, Topics.
501 _aProject
504 _a
520 _aThe newly completed electrical switchgear building is the first Net Zero Energy (NZE) targeted electrical substation building in the United States. Tucked midblock on Eddy Street between Larkin and Hyde in San Francisco, the steel frame concrete structure is a modern addition to the existing historic 1962 substation building designed by PG&E to supply power to the northeastern part of the city.
653 _aTechnology and fabrication
653 _aMiddle density
653 _aproject
653 5 _aSan Francisco, USA
653 5 _aUSA
856 4 0 _uhttps://urbannext.net/larkin-street-substation-expansion/
_zAccess to info
942 _2ddc
_cCF
_n0
999 _c2893
_d2893