000 01751nmm a22003017a 4500
003 ES-BaAUN
005 20230928074401.0
008 221102| ||||go||d|||||| |||| 00| 0 eng d
022 _a2575-5374
040 _aES-BaAUN
_beng
_cES-BaAUN
110 2 _aCarmody Groarke (Firm) ‎
_earchitect.
245 _aGent Waste Brick:
_bReducing the Construction Embodied Carbon
260 3 _burbanNext,
_cOctober 27, 2022.
300 _a486 words.
500 _aCarmody Groarke, Contributors, Densities, Formats, No Density, Project, Technology and fabrication, Topics.
501 _aBelgium, Brick, Carbon-emissions, Circular economy, CO2 emissions, Concrete, Designing Matter, Fabrication, Ghent, Local manufacture, Local resources, Performative Envelope, Project, Recycling, Resilience, Tradition, Waste management.
504 _aDesign team: Carmody Goarke, BC Materials, Local Works Studio and TRANS architects.
504 _aA Belgian clay-fired brick is typically calculated at 0.54 kg CO2e/kg. Data sourced from TOTEM: EcoInvent Database for a 60-year life cycle, Stages A-D to EN15804+A2:2019.
520 _aAs part of a masterplan to transform the Design Museum Gent, the museum is undertaking a major renovation project to extend its existing buildings. Due to start on site later in the year, the new wing will house galleries and event spaces to broaden the museum’s cultural programming and visitor outreach.
653 _aNo density
653 _aTechnology and fabrication
653 _aCircular economy
653 _aLocal resources
653 _aDesigning matter
653 5 _aGhent
856 4 0 _uhttps://urbannext.net/gent-waste-brick-reducing-the-construction-embodied-carbon/
_zAccess to info
942 _2ddc
_cCF
_n0
999 _c2941
_d2941